Permit to Dig: How to Avoid Buried Services on UK Sites

Every time someone breaks ground, whether it's a fence post, a trench or a soakaway, there's a chance of hitting a live cable or gas main. The law on this is short and strict. The practical answer is a safe system of work that HSE has set out for years in its guidance HSG47, Avoiding danger from underground services. A permit to dig is the most common way contractors put that system on paper and make sure nobody skips a step.

By

Every time someone breaks ground, whether it's a fence post, a trench or a soakaway, there's a chance of hitting a live cable or gas main. The law on this is short and strict. The practical answer is a safe system of work that HSE has set out for years in its guidance HSG47, Avoiding danger from underground services. A permit to dig is the most common way contractors put that system on paper and make sure nobody skips a step.

A recent case: a fencing breaker and a live cable

HSE reported on 27 May 2026 that City Fencing Contractors Limited had been fined £10,000, with £5,487 costs. On 21 May 2024, an employee installing security fencing on a Manchester site was using a breaker to dig. He struck a live underground cable and suffered an electric shock and burns to his stomach, chest and arms.

HSE found that the company had failed to put suitable and sufficient controls in place against the risk from underground services. It pleaded guilty to breaching regulation 25(4) of CDM 2015. The HSE inspector said it "could have been much worse and potentially fatal".

What the law says

  • CDM 2015, regulation 25(4): construction work that could create a risk from an underground service, or from damaging or disturbing one, must not be carried out unless suitable and sufficient steps have been taken to prevent that risk, so far as reasonably practicable. (legislation.gov.uk)
  • CDM 2015, regulation 22: all practicable steps must be taken to stop excavations collapsing and people being buried or trapped. (legislation.gov.uk)
  • Management Regulations 1999, regulation 3: you need a suitable and sufficient risk assessment before the work. (legislation.gov.uk)

There is no statutory "permit to dig" form. The legal duty is to prevent the risk. HSG47 says a permit system "may be appropriate for particularly hazardous work". On most sites, and on almost every principal contractor's site, the permit to dig is how you show the steps were taken before anyone broke ground.

HSG47's three-part safe system

HSE's HSG47 (third edition) and its excavation and underground services page break the safe system into three parts. A good permit to dig follows the same order.

1. Plan the work

  • Get the plans. Obtain and review plans or other suitable information for all buried services in the area before digging starts. HSG47 says a desktop study of service drawings should be done for all projects that involve excavating or penetrating the ground.
  • Don't trust the plans alone. HSE says plans give only an indication of where services are and how many there are. They aren't always accurate, and service connections often aren't shown. Cables may snake rather than run straight.
  • Check who owns what. HSE notes that most service cables belong to a Distribution Network Operator, but some belong to others, such as the highways authority, the Ministry of Defence or Network Rail.
  • Ask whether the service can be made dead. HSE notes that electricity companies must give customers five days' notice of a disconnection.
  • Treat unknowns as live. If the job is an emergency and no plans can be found, HSE says to work as though there are live buried services in the area.
  • Get information from the client. On commercial jobs, HSE's excavations page says clients must provide information such as the location of existing services.

2. Detect, identify and mark

  • Locate before you dig. HSE says a competent person must trace cables using suitable locating devices (the familiar CAT and Genny), using the plans as a guide. Locators should be used frequently and repeatedly during the work, not just once at the start.
  • Use trained operators. HSE says people using a locator should be thoroughly trained in its use and its limits. Locators should be used to the manufacturer's instructions and regularly checked and maintained.
  • Know the gaps. HSG47 warns that many telecoms and signalling cables can't be detected unless they have an earthed metal sheath, markers or ducts.
  • Confirm with trial holes. HSG47 says to use trial holes to positively identify a service and its depth.
  • Mark it properly. Use crayon, chalk or paint on hard surfaces, or wooden pegs to one side of the service on soft ground. Don't use steel pins or spikes that could damage shallow services. Mark the services on site plans too.

3. Dig safely

  • Hand-dig to expose. HSE says to dig trial holes with suitable hand tools, excavate alongside the service rather than on top of it, and finish exposing it by digging horizontally. Use insulated tools near electric cables.
  • Be careful with power tools near the line. HSG47 says that, where practicable, hand-held power tools used to break hard surfaces should only be used 500 mm or more from the indicated line of a buried service. Then locate the service by careful hand digging under the surface. It explains the limited cases where that margin may be reduced.
  • If a cable is struck: HSG47 says excavator drivers should stay in the cab. The area should be isolated and secured, and nobody should approach until the owner has made the cable safe.

What to put on a permit to dig

Build the three steps above into the form so they can't be skipped. HSG47 says a permit system should clearly identify:

  • Who may authorise the work and who sets the precautions
  • What work counts as hazardous
  • The permitted task, its risks, how long it lasts and the controls

A practical permit to dig records:

  1. The exact dig area, depth, method and validity period
  2. The service plans obtained, with dates and which utilities
  3. The locator survey: who did it, which equipment and when it was last calibrated or checked
  4. Services found and marked, plus trial hole results
  5. A hand-dig hold point: no mechanical digging until services are exposed or proved clear
  6. Excavation support, edge protection and spoil position (see below)
  7. What to do if a service is struck, with emergency contacts
  8. Authorisation, a handover to the person digging, and close-out, including backfill that protects the services. HSG47 says concrete must not be used to encase services.

The SafetyPod Permit to Dig template (£3.99) is a two-stage permit. It covers a hand-dig hold point and mechanical excavation authorisation, underground service checks, spoil management and supervisor sign-off. For what goes in each box, see Permit to dig template: what to include.

Managing permits to dig on site

Searches for "permit to dig management" mostly come from site managers running several gangs. Some simple rules:

  • One permit, one area, one period. Re-issue it if the area, method or plant changes.
  • The issuer checks the ground, not just the paperwork. Walk the area, check the marks and keep the plans to hand.
  • Brief the person receiving the permit on the services found and the hold point, and get them to sign.
  • Re-scan when work restarts or the dig moves. HSE expects locators to be used repeatedly during the work.
  • Close out every permit and keep it with your site records.
  • Supervise and monitor. HSG47 says a permit system needs supervision and monitoring to make sure its conditions are followed.

Don't forget the hole itself

Buried services are one hazard. The excavation is another. HSE's excavations guidance says to:

  • Decide the temporary support before digging, and have it on site before work starts
  • Keep plant and spoil back from the edges
  • Protect edges with substantial barriers where people could fall in
  • Provide a safe way in and out
  • Have a competent person inspect at the start of each shift and after any event that may have affected stability, and keep a record

Cover these in the Control of Excavations Risk Assessment (£3.99). Brief the gang with the Excavations Toolbox Talk (£3.99, with an attendance record). If the dig is close to overhead lines too, HSE warns about tipper bodies and excavators arcing. See GS6.

Get the groundworks paperwork

NeedTemplatePrice
Authorise and record the digPermit to Dig£3.99
Excavation risk assessmentControl of Excavations RA£3.99
Crew briefingExcavations Toolbox Talk£3.99
Keep people out of the dig areaLimitation of Access Permit£3.99
Permit to dig, excavations RA, plant, confined spaces, HAVS, noise and more (17 documents)Groundworker pack£14.99
All 13 RAMS and permit documentsRAMS & Permits Bundle£12.99
Every templateMembership£69 a year

Compare everything on the pricing page. Templates are editable Word files. Complete them for the real site and have a competent person review them.

FAQ

Is a permit to dig a legal requirement?

No specific form is required by law. CDM 2015 regulation 25(4) says you must not carry out work that could create a risk from underground services unless suitable and sufficient steps have been taken to prevent it. A permit to dig is the usual way to show you took those steps, and most principal contractors insist on one.

Do I need a permit to dig for hand digging or a single fence post?

The legal duty applies whatever the size of the dig. In the May 2026 HSE case, the worker was digging with a breaker for fence installation. If the ground could contain services, plan, locate and mark before you dig. Many sites require a permit for any ground breaking.

Who can issue a permit to dig?

Someone authorised by the contractor in control of the work who is competent to check the plans, survey results and controls. HSG47 says the permit system should clearly identify who may authorise jobs.

What is a CAT and Genny?

A CAT (cable avoidance tool) detects buried cables and pipes, and the Genny (signal generator) puts a traceable signal on a service. HSE says locators must be used by trained people, used repeatedly during the work and kept maintained. Some cables can't be detected, so a scan doesn't prove the ground is clear.

How far from a service can I use a breaker?

HSG47 says that, where practicable, hand-held power tools should be used 500 mm or more from the indicated line of a service buried in or below a hard surface. After that, locate the service by careful hand digging. Read HSG47 for the limited cases where that margin may be reduced.

What should I do if we hit a cable?

Follow HSG47: the excavator driver stays in the cab, the area is isolated and secured, nobody approaches the cable or machine, and the cable owner is called to make it safe.