Construction phase plan template (CDM 2015) — free download

A construction phase plan (CPP) is required for every construction project under CDM 2015. Here is what it must cover, and a free editable template.

Do you legally need a construction phase plan?

Yes. Under CDM 2015 a CPP is required for all construction work. On a simple job the contractor prepares it. On a multi-contractor project, the principal contractor does.

What goes in it

Project description, duty holders, existing hazards, site rules and welfare, arrangements for the main risks, emergency procedures, how RAMS and permits will be controlled, and a review when the work changes.

Free template

SafetyPod's CPP template is free. Download it from the free templates page.

The CPP does not replace task RAMS. You will still be asked for risk assessments and permits. A trade pack is £14.99. Membership is £69/year.

Frequently asked questions

Is there a free construction phase plan template for CDM 2015?

Yes. Download SafetyPod's free editable construction phase plan from the free templates page.

Is a construction phase plan required for small jobs?

Yes. CDM 2015 requires a construction phase plan for every construction project, including single-contractor and domestic work.

Who writes the construction phase plan?

Principal contractor on multi-contractor jobs; the contractor on a single-contractor job. The client must make sure a plan is in place before construction starts.

Does a construction phase plan replace RAMS?

No. The CPP sets out site-wide arrangements. Task-specific RAMS still sit underneath it.

Get the templates