Electrical Contractor Trade Pack

14 essential electrical documents — permits, risk assessments & testing forms. Save over 70% vs buying individually.

The complete Electrical Contractor document pack. 14 documents covering the full electrical workflow from permits and isolation through cable installation to testing and energisation. Includes Electrical Permit to Work, Sanction to Electrical Test, Isolation of Supply Permit, Permit to Energise, plus 10 task-specific risk assessments for cable installation, distribution boards, conduit/trunking, containment systems, and circuit testing. Everything an electrical contractor needs for BS 7671 and CDM 2015 compliance. All 14 documents delivered instantly by email.

Compliance
Electricity at Work Regulations 1989 / BS 7671 / CDM 2015
Category
Trade Packs
Price
£24.99
Pages
14

What's Included

  • Electrical Permit to Work
  • Sanction to Electrical Test
  • Isolation of Supply Permit
  • Permit to Energise
  • Energising Electrical Circuits Risk Assessment
  • Testing and Inspecting Electrical Circuits Risk Assessment
  • Working on Existing Distribution Boards Risk Assessment
  • Working on New Distribution Boards Risk Assessment
  • Installation of Cables Risk Assessment
  • Installing Armoured Cables in Ducts Risk Assessment
  • Installing Armoured Cables on Trays Risk Assessment
  • Installing Conduit, Trunking & Cable Tray Risk Assessment
  • Installation of Containment Systems Risk Assessment
  • Removing Cables from Existing Electrical Installation Risk Assessment

Download this HSE-compliant Electrical Contractor Trade Pack template instantly for £24.99. Written by a NEBOSH-qualified Health & Safety Manager.

Download Electrical Contractor Trade Pack

Related Trade Packs Templates

View all Trade Packs templates