Site Monitoring Forms for UK Construction
Ongoing site monitoring forms for UK construction projects. Use these to carry out regular checks during the construction phase — covering COSHH, working at height, noise, HAVS, RAMS compliance, and more.
- Fire & Emergency Plans Site Monitoring — Monitor fire prevention, detection, suppression and emergency arrangements on site.
- First Aid & Welfare Site Monitoring — Monitor first aid provisions and welfare facilities across your construction site.
- HAVS Site Monitoring — Monitor Hand-Arm Vibration Syndrome controls and tool vibration log on site.
- Housekeeping & Waste Disposal Site Monitoring — Monitor housekeeping standards and waste disposal arrangements to reduce slip and fire risks.
- Roof Works Site Monitoring — Monitor H&S controls for roof works — one of the highest-risk construction activities.
- Noise Site Monitoring — Monitor noise levels and hearing protection controls to prevent occupational noise-induced hearing loss.
- Cartridge Operated Tools Site Monitoring — Monitor safe use and storage of cartridge-operated fixing tools on construction sites.
- Safe Access & Egress Site Monitoring — Monitor safe routes of access and egress across all areas of the construction site.
- Manual Handling Site Monitoring — Monitor manual handling tasks and controls to reduce musculoskeletal injury risk on site.
- Electricity Site Monitoring — Monitor electrical safety controls, temporary supplies and equipment on construction sites.
- Mobile Plant Site Monitoring — Monitor the safe operation and management of mobile plant and vehicles on site.
- Work Equipment Site Monitoring — Monitor the condition, inspection status and safe use of all work equipment on site.
- Site Environmental Checklist — Monitor environmental controls on site — waste, water, air quality, and ecology protection.
- Access Equipment Register — Site register for tracking all access equipment arrivals, inspections and departures.
- Cranes & Lifting Equipment Site Checklist — LOLER-aligned site checklist for cranes and lifting equipment covering 15 critical control areas.
- Confined Space Site Monitoring — 16-point site monitoring checklist for confined space work covering atmospheric testing, rescue and standby.
- Hot Works Site Monitoring Checklist — Pre, during, and post hot works monitoring checklist — fire watcher log and 60-min fire watch.